DQRID : D020617.1
Start DateStart TimeEnd DateEnd Time Data Quality Metric
10/06/1999105010/06/19991110Incorrect
more
Subject:
SGP/SMOS/E5 - Lowered to surface to install counterweights
DataStreams:sgp30smosE5.a1, sgp1smosE5.00, sgp1440smosE5.a0, sgpsmosE5.01, sgp1smosE5.a0
Description:
The E5 SMOS was lowered to the surface on 6 OCT 1999 between 1050 and 1110 GMT 
while counterweights were installed.  All wind speed and direction data are incorrect 
during this period.
Suggestions: 
Wind speed and direction are incorrect during this period.
Measurements:sgpsmosE5.01:
  • Raw data stream - documentation not supported
more
sgp1440smosE5.a0:
  • time_max_wspd
  • min_wspd
  • max_wspd
  • time_min_wspd
more
sgp1smosE5.a0:
  • wdir
  • wspd_va
  • sd_deg
  • wspd
more
sgp30smosE5.a1:
  • sd_wspd
  • wdir
  • wspd_va
  • wspd
  • sd_deg
more
sgp1smosE5.00:
  • Raw data stream - documentation not supported
more

Close this window