DQRID : D020617.2
Start DateStart TimeEnd DateEnd Time Data Quality Metric
10/06/1999150510/06/19991522Incorrect
more
Subject:
SGP/SMOS/E6 - E6 SMOS lowered to surface to install counterweights
DataStreams:sgpsmosE6.01, sgp1smosE6.a0, sgp30smosE6.a1, sgp1440smosE6.a0, sgp1smosE6.00
Description:
The E6 SMOS was lowered to the surface on 6 OCT 1999 between 1505 and 1522 GMT 
while counterweights were installed.  All wind speed and direction data are incorrect 
during this period.
Suggestions: 
Wind speed and direction are incorrect during this period.
Measurements:sgpsmosE6.01:
  • Raw data stream - documentation not supported
more
sgp30smosE6.a1:
  • sd_wspd
  • wspd
  • sd_deg
  • wspd_va
  • wdir
more
sgp1smosE6.00:
  • Raw data stream - documentation not supported
more
sgp1440smosE6.a0:
  • min_wspd
  • time_min_wspd
  • max_wspd
  • time_max_wspd
more
sgp1smosE6.a0:
  • sd_deg
  • wspd_va
  • wspd
  • wdir
more

Close this window