DQRID : D020619.1
Start DateStart TimeEnd DateEnd Time Data Quality Metric
10/08/1999074010/08/19990755Incorrect
more
Subject:
SGP/SMOS/E7 - E7 SMOS lowered to surface to install counterweights
DataStreams:sgp1smosE7.00, sgpsmosE7.01, sgp30smosE7.a1, sgp1smosE7.a0, sgp1440smosE7.a0
Description:
The E7 SMOS was lowered to the surface on 8 OCT 1999 between 0740 and 0755 GMT 
while counterweights were installed.  All wind speed and direction data are incorrect 
during this period.
Suggestions: 
Wind speed and direction are incorrect during this period.
Measurements:sgpsmosE7.01:
  • Raw data stream - documentation not supported
more
sgp1440smosE7.a0:
  • time_max_wspd
  • min_wspd
  • time_min_wspd
  • max_wspd
more
sgp30smosE7.a1:
  • wspd_va
  • sd_wspd
  • sd_deg
  • wdir
  • wspd
more
sgp1smosE7.00:
  • Raw data stream - documentation not supported
more
sgp1smosE7.a0:
  • sd_deg
  • wspd
  • wspd_va
  • wdir
more

Close this window