DQRID : D020620.1
Start DateStart TimeEnd DateEnd Time Data Quality Metric
10/20/1999111010/20/19991126Incorrect
more
Subject:
SGP/SMOS/E9 - E9 SMOS lowered to surface to install counterweights
DataStreams:sgp1440smosE9.a0, sgp30smosE9.a1, sgp1smosE9.a0, sgp1smosE9.00, sgpsmosE9.01
Description:
The E9 SMOS was lowered to the surface on 20 OCT 1999 between 1110 and 1126 GMT 
while counterweights were installed.  All wind speed and direction data are incorrect 
during this period.
Suggestions: 
Wind speed and direction are incorrect during this period.
Measurements:sgpsmosE9.01:
  • Raw data stream - documentation not supported
more
sgp1smosE9.a0:
  • wdir
  • wspd_va
  • wspd
  • sd_deg
more
sgp1440smosE9.a0:
  • max_wspd
  • time_max_wspd
  • time_min_wspd
  • min_wspd
more
sgp30smosE9.a1:
  • wspd_va
  • wspd
  • sd_wspd
  • wdir
  • sd_deg
more
sgp1smosE9.00:
  • Raw data stream - documentation not supported
more

Close this window