DQRID : D020620.44
Start DateStart TimeEnd DateEnd Time Data Quality Metric
10/05/1999091510/05/19990932Incorrect
more
Subject:
SGP/SMOS/E15 - E15 SMOS lowered to surface to install counterweights
DataStreams:sgpsmosE15.01, sgp1smosE15.00, sgp1440smosE15.a0, sgp30smosE15.a1, sgp1smosE15.a0
Description:
The E15 SMOS was lowered to the surface on 5 OCT 1999 between 0915 and 0932 GMT 
while counterweights were installed.  All wind speeds and direction data are incorrect
during this period.
Suggestions: 
Wind speed and direction are incorrect during this period.
Measurements:sgp1440smosE15.a0:
  • time_max_wspd
  • time_min_wspd
  • max_wspd
  • min_wspd
more
sgp30smosE15.a1:
  • sd_deg
  • sd_wspd
  • wspd_va
  • wspd
  • wdir
more
sgp1smosE15.a0:
  • wspd_va
  • sd_deg
  • wdir
  • wspd
more
sgp1smosE15.00:
  • Raw data stream - documentation not supported
more
sgpsmosE15.01:
  • Raw data stream - documentation not supported
more

Close this window