DQRID : D020620.60
Start DateStart TimeEnd DateEnd Time Data Quality Metric
10/13/1999100310/13/19991015Incorrect
more
Subject:
SGP/SMOS/E20 - E20 SMOS lowered to surface to install counterweights
DataStreams:sgp1smosE20.a0, sgp1440smosE20.a0, sgp1smosE20.00, sgpsmosE20.01, sgp30smosE20.a1
Description:
The E20 SMOS was lowered to the surface on 13 OCT 1999 between 1003 and 1015 GMT 
while counterweights were installed.  All wind speed and direction are incorrect 
during this period.
Suggestions: 
Wind speed and direction are incorrect during this period.
Measurements:sgp1smosE20.a0:
  • sd_deg
  • wdir
  • wspd
  • wspd_va
more
sgp1smosE20.00:
  • Raw data stream - documentation not supported
more
sgp1440smosE20.a0:
  • max_wspd
  • time_max_wspd
  • min_wspd
  • time_min_wspd
more
sgp30smosE20.a1:
  • wdir
  • wspd_va
  • sd_wspd
  • sd_deg
  • wspd
more
sgpsmosE20.01:
  • Raw data stream - documentation not supported
more

Close this window