DQRID : D020620.68
Start DateStart TimeEnd DateEnd Time Data Quality Metric
10/13/1999074510/13/19990810Incorrect
more
Subject:
SGP/SMOS/E25 - E25 SMOS lowered to surface to install counterweights
DataStreams:sgpsmosE25.01, sgp1smosE25.00, sgp30smosE25.a1, sgp1smosE25.a0
Description:
The E25 SMOS was lowered to the surface on 13 OCT 1999 between 0745 and 0810 GMT 
while counterweights were installed.  All wind speed and direction data are 
incorrect during this period.
Suggestions: 
Wind speed and direction are incorrect during this period.
Measurements:sgp30smosE25.a1:
  • sd_wspd
  • wdir
  • sd_deg
  • wspd
  • wspd_va
more
sgp1smosE25.00:
  • Raw data stream - documentation not supported
more
sgp1smosE25.a0:
  • sd_deg
  • wspd
  • wdir
  • wspd_va
more
sgpsmosE25.01:
  • Raw data stream - documentation not supported
more

Close this window