Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
10/13/1999 | 1345 | 10/13/1999 | 1420 | Suspect |
Subject: | SGP/SMOS/E24 - E24 SMOS lowered to surface to install counterweights |
DataStreams: | sgpsmosE24.01, sgp1smosE24.a0, sgp1smosE24.00, sgp30smosE24.a1 |
Description: | The E24 SMOS was lowered to the surface on 13 OCT 1999 between 1345 and 1420 GMT while counterweights were installed. All temperature and humidity data taken during this period are questionable. |
Suggestions: | Temperature and humidity are questionable during this period. |
Measurements: | sgp30smosE24.a1: more
sgp1smosE24.00: more sgp1smosE24.a0: more sgpsmosE24.01: more |