Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
10/05/1999 | 1325 | 10/05/1999 | 1350 | Suspect |
Subject: | SGP/SMOS/E8 - E8 SMOS lowered to surface to install couterweights |
DataStreams: | sgp1smosE8.a0, sgp1smosE8.00, sgp1440smosE8.a0, sgpsmosE8.01, sgp30smosE8.a1 |
Description: | The E8 SMOS was lowered to the surface on 5 OCT 1999 between 1325 and 1350 GMT while counterweights were installed. All temperature and humidity data are questionable during this period. |
Suggestions: | Temperature and humidity are questionable during this period. |
Measurements: | sgp1smosE8.a0: more
sgpsmosE8.01: more sgp1440smosE8.a0: more sgp30smosE8.a1: more sgp1smosE8.00: more |