Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
10/08/1999 | 0740 | 10/08/1999 | 0755 | Suspect |
Subject: | SGP/SMOS/E7 - E7 SMOS lowered to surface to install counterweights |
DataStreams: | sgp1smosE7.00, sgpsmosE7.01, sgp30smosE7.a1, sgp1smosE7.a0, sgp1440smosE7.a0 |
Description: | The E7 SMOS was lowered to the surface on 8 OCT 1999 between 0740 and 0755 GMT while counterweights were installed. All temperature and humidity data are questionable during this period. |
Suggestions: | Temperature and humidity are questionable during this period. |
Measurements: | sgpsmosE7.01: more
sgp1440smosE7.a0: more sgp30smosE7.a1: more sgp1smosE7.00: more sgp1smosE7.a0: more |