Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
10/06/1999 | 1050 | 10/06/1999 | 1110 | Suspect |
Subject: | SGP/SMOS/E5 - Lowered to surface to install couterweights |
DataStreams: | sgp30smosE5.a1, sgp1smosE5.00, sgp1440smosE5.a0, sgpsmosE5.01, sgp1smosE5.a0 |
Description: | The E5 SMOS was lowered to the surface on 6 OCT 1999 between 1050 and 1110 GMT while counterweights were installed. All temperature and humidity data are questionable during this period |
Suggestions: | Temperature and humidity are questionable during this period. |
Measurements: | sgpsmosE5.01: more
sgp1440smosE5.a0: more sgp1smosE5.a0: more sgp30smosE5.a1: more sgp1smosE5.00: more |