DQRID : D151102.3
Start DateStart TimeEnd DateEnd Time Data Quality Metric
09/22/2015000010/25/20150321Incorrect
more
Subject:
OLI/GNDRAD/M1 - PIR cable connector failure
DataStreams:oligndrad60sM1.b1, oligndrad20sM1.a0
Description:
During the specified time period upwelling PIR cable/connector problems were being 
corrected.
Suggestions: 
Do not use data
Measurements:oligndrad20sM1.a0:
  • inst_up_long_hemisp_dome_resist
  • inst_up_long_hemisp_tp
  • inst_up_long_hemisp_case_resist
more
oligndrad60sM1.b1:
  • inst_up_long_hemisp_tp
  • inst_up_long_hemisp_dome_temp
  • up_long_hemisp
  • up_long_hemisp_std
  • up_long_hemisp_min
  • up_long_hemisp_max
  • inst_up_long_hemisp_case_temp
more

Close this window