Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
01/05/2005 | 2100 | 01/21/2005 | 0445 | Incorrect |
Subject: | SGP/NIMFR/C1 - Head connector failure |
DataStreams: | sgpnimfrC1.b1, sgpnimfrlangplotE13.c1, sgpnimfrod1barnmichE13.c1, sgpnimfrlangleyE13.c1, sgpnimfrE13.b1, sgpnimfrE13.a0 |
Description: | The direct beam, head and tube temperatures went to zero beginning 20050105. The head connector was reseated 20050118 correcting the problem but the head signal cable was stressed again 20050120 through 20050121 resulting in poor data. Data between 20050118-20050120 may be ok but should be examined carefully. |
Suggestions: | |
Measurements: | sgpnimfrC1.b1:
sgpnimfrlangleyE13.c1:
sgpnimfrE13.b1:
sgpnimfrE13.a0:
sgpnimfrlangplotE13.c1:
sgpnimfrod1barnmichE13.c1:
|