Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
12/23/2013 | 1654 | 03/12/2014 | 1607 | Incorrect |
Subject: | MAO/TSI/M1 - Shadowband misalignment |
DataStreams: | maotsiskyimageM1.a1, maotsimovieM1.a1, maotsicldmaskM1.a1, maotsiskycoverM1.b1 |
Description: | The TSI was either not operating and/or the shadowband was misaligned. The mirror control board did not work on deployment and was repaired at PNNL. The instrument was replaced with the spare on 3/7 and the shadowband alignment was corrected on 3/12. |
Suggestions: | |
Measurements: | maotsicldmaskM1.a1: more
maotsiskyimageM1.a1: more maotsimovieM1.a1: more maotsiskycoverM1.b1: more |