DQRID : D140415.1
Start DateStart TimeEnd DateEnd Time Data Quality Metric
04/13/2014070004/15/20142210Missing
more
Subject:
MAO/CEIL/M1 - Power outage, UPS overload
DataStreams:maoceilM1.b1
Description:
The UPS was overloaded and caused instrument shutdown. The UPS was replaced.
Suggestions: 
Measurements:maoceilM1.b1:
  • backscatter
  • lon
  • range
  • background_light
  • receiver_sensitivity
  • measurement_parameters
  • status_flag
  • window_contamination
  • detection_status
  • time
  • laser_pulse_energy
  • alt
  • tilt_angle
  • status_string
  • lat
  • first_cbh
  • base_time
  • laser_temperature
  • alt_highest_signal
  • second_cbh
  • time_offset
  • third_cbh
  • vertical_visibility
  • sum_backscatter
more