DQRID : D950626.9
Start DateStart TimeEnd DateEnd Time Data Quality Metric
03/19/1995190504/12/19951430Incorrect
03/17/1995200003/19/19950500Incorrect
more
Subject:
SGP/EBBR/E26 - Frozen Wind Speed Sensor
DataStreams:sgp30ebbrE26.b1, sgp5ebbrE26.b1, sgp15ebbrE26.b1
Description:
A broken lead on the EBBR wind speed instrument cable at Cement, OK (E26)
resulted in the loss of wind speed data.  It was nearly a month before the
cable could be repaired and reinstalled.  All 5, 15, and 30
minute data values indicated below are incorrect for the periods listed above.

5 minute:  wind_s, res_ws
15 minute: wind_s
30 minute: wind_s, res_ws
Suggestions: 
Measurements:sgp5ebbrE26.b1:
  • wspd_vec_mean
  • wspd_arith_mean
more
sgp15ebbrE26.b1:
  • wspd_arith_mean
more
sgp30ebbrE26.b1:
  • wspd_arith_mean
  • wspd_vec_mean
more

Close this window