DQRID : D970605.1
Start DateStart TimeEnd DateEnd Time Data Quality Metric
03/03/1997163005/28/19972110Suspect
more
Subject:
SGP/TWR/C1 - Reprocess: 25m and 60m T/RH Comm Lines Switched
DataStreams:sgp1twr25mC1.a0, sgp30twr25mC1.a1, sgp30twr60mC1.a1, sgp1twr60mC1.a0
Description:
On 3 March 1997 an activity of unknown nature took place at SGP, causing 
the communication lines to the 25 and 60 meter T/RH to be switched.  The 
data indicates that the switch occurred between 1630 and 1700 GMT.  I 
submitted a work request to site operations to determine if the two levels 
were switched; they found that they were, as I suspected.  It is not clear 
where this occurred, although we do know that it did not happen at the 
tower CR21X dataloggers location.  The communication lines were temporarily 
"switched back" at the logger location on May 28 at 2110 GMT until it can be 
determined where the switch was actually made.
Suggestions: 
Reprocess data.
Measurements:sgp1twr25mC1.a0:
  • vap_pres
  • temp
  • rh
more
sgp1twr60mC1.a0:
  • temp
  • vap_pres
  • rh
more
sgp30twr25mC1.a1:
  • sd_temp
  • rh
  • vap_pres
  • sd_vap_pres
  • sd_rh
more
sgp30twr60mC1.a1:
  • sd_temp
  • rh
  • sd_vap_pres
  • vap_pres
  • sd_rh
more

Close this window