Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
03/03/1997 | 1630 | 05/28/1997 | 2110 | Suspect |
Subject: | SGP/TWR/C1 - Reprocess: 25m and 60m T/RH Comm Lines Switched |
DataStreams: | sgp1twr25mC1.a0, sgp30twr25mC1.a1, sgp30twr60mC1.a1, sgp1twr60mC1.a0 |
Description: | On 3 March 1997 an activity of unknown nature took place at SGP, causing the communication lines to the 25 and 60 meter T/RH to be switched. The data indicates that the switch occurred between 1630 and 1700 GMT. I submitted a work request to site operations to determine if the two levels were switched; they found that they were, as I suspected. It is not clear where this occurred, although we do know that it did not happen at the tower CR21X dataloggers location. The communication lines were temporarily "switched back" at the logger location on May 28 at 2110 GMT until it can be determined where the switch was actually made. |
Suggestions: | Reprocess data. |
Measurements: | sgp1twr25mC1.a0: more
sgp1twr60mC1.a0: more sgp30twr25mC1.a1: more sgp30twr60mC1.a1: more |