Start Date | Start Time | End Date | End Time |
---|---|---|---|
02/21/2006 | 2008 | 03/07/2006 | 1950 |
Subject: | SGP/SIRS/E1 - Reprocessed and Corrected: incorrect calibration coefficients |
DataStreams: | sgpsirsE1.00, sgpsirsE1.b1 |
Description: | DATA REPROCESSED and CORRECTED: During the changeover from 4 to 1 coefficients for the PIRs at SIRS/E1 the data logger program was programmed with the wrong calibration coefficients and serial number for the US PSP instrument measuring the upwelling_hemispheric_shortwave_radiation. The calibration Coefficient was 114.43 W/m2/mV when it should have been 104.47 W/m2/mV. The data were recalibrated to correct the error and reprocessed. The data were archived in September 2016. Please retrieve the reprocessed data for use in your analysis. You may find these data using the ARM Discovery tool at the following link: http://www.archive.arm.gov/discovery/#v/results/s/finst::sirs/fsite::sgp/ffac::sgp.E1 ORIGINAL DQR CATEGORY: Red( Incorrect) REPROCESSED and CORRECTED DATA ARCHIVED:2016-09 REPROCESS IDENTIFICATION NUMBER: RID 248 --------------------------------------------------- --- ORIGINAL DQR DESCRIPTION --- --------------------------------------------------- During the changeover from 4 to 1 coefficient for the PIRs at SIRS/E1 (PIF) the datalogger program was programmed with the wrong calibration coefficient and serial number for the US PSP instrument measuring the Upwelling Hemispheric Shortwave radiation. The calibration coefficient was 114.43 W/m2/mV (instrument 30618F3) when it should have been 104.47W/m2/mV (instrument 29618F3) |
Suggestions: | |
Measurements: | sgpsirsE1.b1: more
sgpsirsE1.00: more |