DQR ID | Subject | Data Streams Affected |
---|---|---|
D051206.5 | TWP/GNDRAD/C3 - IRT malfunction | twpgndrad60sC3.b1 |
D060630.36 | TWP/GNDRAD/C3 - Reprocess: Longwave Calibration error | twpgndrad60sC3.b1 |
Start Date | Start Time | End Date | End Time |
---|---|---|---|
11/21/2005 | 1500 | 12/05/2005 | 0100 |
Subject: | TWP/GNDRAD/C3 - IRT malfunction |
DataStreams: | twpgndrad60sC3.b1 |
Description: | The internal IRT power supply failed (probably due to a lightning strike on 11/14) and was drawing excessive current on the data logger's DC system. The problem was corrected by replacing the instrument with a spare. |
Measurements: | twpgndrad60sC3.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
05/20/2004 | 0100 | 12/21/2005 | 2137 |
Subject: | TWP/GNDRAD/C3 - Reprocess: Longwave Calibration error |
DataStreams: | twpgndrad60sC3.b1 |
Description: | Modified pyrgeometer calibration procedures were implemented beginning in December 2003. These modified procedures introduced a calibration bias in the longwave data. The previous procedures were re-implemented at all sites between December 2005 and February 2006 to restore proper calibrations. The data collected while the incorrect procedures were in place are being reprocessing to remove the calibration bias. Note, this also affected standard deviation, maximum and minimum data fields. |
Measurements: | twpgndrad60sC3.b1:
|