DQR ID | Subject | Data Streams Affected |
---|---|---|
D040421.3 | NSA/SKYRAD/C1 - itermittant IRT bias | nsaskyrad60sC1.b1 |
D051101.2 | NSA/SKYRAD/C1 - IRT failure | nsaskyrad60sC1.b1 |
D060209.5 | NSA/SKYRAD/C1 - Power outage affecting some SKYRAD instruments | nsaskyrad20sC1.a0, nsaskyrad60sC1.b1, nsaskyradC1.00 |
D080222.3 | NSA/SKYRAD/C1 - IRT mirror heater failure | nsaskyrad20sC1.a0, nsaskyrad60sC1.b1 |
Start Date | Start Time | End Date | End Time |
---|---|---|---|
03/28/2003 | 0200 | 06/21/2006 | 0215 |
Subject: | NSA/SKYRAD/C1 - itermittant IRT bias |
DataStreams: | nsaskyrad60sC1.b1 |
Description: | A problem with the SKYRAD IRT that itermittantly produced a gradual increase in the sky temperature measurement then a sudden correction, as compared to AERI, appears to have been caused by a combination of a failing IR detector, a poor signal cable, a contaminated (with condensation or frost) mirror or lens, and low ambient temperatures. The positive bias was apparently not consistant in either frequency or duration but on days when the unusual behavior is observed, it usually occurred from about 00:00 to 06:00 local time. The instrument was repaired and recalibrated and the signal cable replaced. |
Measurements: | nsaskyrad60sC1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
10/31/2005 | 0600 | 01/18/2006 | 0032 |
Subject: | NSA/SKYRAD/C1 - IRT failure |
DataStreams: | nsaskyrad60sC1.b1 |
Description: | The IRT failed and was replaced with a spare. |
Measurements: | nsaskyrad60sC1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
02/07/2006 | 0910 | 02/07/2006 | 2350 |
Subject: | NSA/SKYRAD/C1 - Power outage affecting some SKYRAD instruments |
DataStreams: | nsaskyrad20sC1.a0, nsaskyrad60sC1.b1, nsaskyradC1.00 |
Description: | During the power outage the downwelling global measurement from the PSP instrument and downwelling diffuse 8-48 instrument shows a slight increase from -5 to +0 W/m2. This is due to removal of thermal offsets induced by the AC heater during the power outage. This heater is installed within the PSP ventilator - it is necessary for the NSA/C1 climate. The downwelling longwave PIR instrument is unaffected due to case and dome temperature corrections. The IRT is AC powered and was not operational during this time period. |
Measurements: | nsaskyradC1.00:
nsaskyrad60sC1.b1:
nsaskyrad20sC1.a0:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
12/16/2007 | 0000 | 02/11/2008 | 1135 |
Subject: | NSA/SKYRAD/C1 - IRT mirror heater failure |
DataStreams: | nsaskyrad20sC1.a0, nsaskyrad60sC1.b1 |
Description: | The heater of the IRT gold mirror failed due to a broken wire (that probably occurred on 12/13 during maintenance of the solar tracker) allowing snow and frost to accumulate on the mirror until it was cleared during daily preventative maintenance. The problem was corrected when the heater wires were replaced. |
Measurements: | nsaskyrad60sC1.b1:
nsaskyrad20sC1.a0:
|