Data Quality Reports for Session: 116783 User: sebastien1 Completed: 01/03/2009


TABLE OF CONTENTS

DQR IDSubjectData Streams Affected
D071106.1FKB/GNDRAD/M1 - Reprocessed: Incorrect calibrationsfkbgndrad20sM1.a0, fkbgndrad60sM1.b1


DQRID : D071106.1
Start DateStart TimeEnd DateEnd Time
03/16/2007000011/05/20071344
Subject:
FKB/GNDRAD/M1 - Reprocessed: Incorrect calibrations
DataStreams:fkbgndrad20sM1.a0, fkbgndrad60sM1.b1
Description:
An incorrect calibration coefficient was applied to the up_short_hemispheric instrument 
(PSP) for the specified time period.  Changes in the ARM PSP calibration procedure now 
generates two different calibration coefficients for the same instrument, Cf(non "IR 
corrected")and Cfc("IR corrected").  CFc should have been applied to this instrument but CF was 
erroneously used.

The affected PSP is S/N 34292F3 Cf=117.61 (incorrect applied), Cfc(correct)=116.07W/m2/mV

These data were reprocessed and archived in March 2008.
Measurements:fkbgndrad60sM1.b1:
  • Upwelling (10 meter) Shortwave Hemispheric Irradiance, Pyranometer, Minima(up_short_hemisp_min)
  • Upwelling (10 meter) Shortwave Hemispheric Irradiance, Pyranometer, Standard
    Deviation(up_short_hemisp_std)
  • Upwelling (10 meter) Shortwave Hemispheric Irradiance, Pyranometer, Maxima(up_short_hemisp_max)
  • Upwelling (10 meter) Shortwave Hemispheric Irradiance, Pyranometer(up_short_hemisp)

fkbgndrad20sM1.a0:
  • Instantaneous Upwelling Shortwave Hemispheric Irradiance, Pyranometer(inst_up_short_hemisp)


Back To Table of Contents



END OF DATA