DQR ID | Subject | Data Streams Affected |
---|---|---|
D000613.1 | TWP/C2/GNDRAD Net radiometer | twpgndrad60sC2.a1, twpgndrad60sC2.b1 |
D020613.2 | TWP/C2 Installation | twpgndradC2.00, twpgndrad20sC2.a1, twpgndrad60sC2.a1, twpgndrad60sC2.b1 |
D030224.1 | TWP/GNDRAD/C2 - Calibration Check; GNDRAD instruments inverted | twpgndrad20sC2.a1, twpgndrad60sC2.a1, twpgndrad60sC2.b1 |
D990909.3 | Cailbration interruption of data at TWP Nauru | twpgndradC2.00, twpgndrad20sC2.a1, twpgndrad60sC2.a1, twpgndrad60sC2.b1 |
Start Date | Start Time | End Date | End Time |
---|---|---|---|
11/20/1998 | 0000 | 12/31/1998 | 2359 |
Subject: | TWP/C2/GNDRAD Net radiometer |
DataStreams: | twpgndrad60sC2.a1, twpgndrad60sC2.b1 |
Description: | The discrepancy between the Net radiometer and the net flux calculated from the Eppleys ranged from about 10-15% at mid-day under clear sky conditions with the Net radiometer reporting the lower value. |
Measurements: | twpgndrad60sC2.b1:
twpgndrad60sC2.a1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
10/24/1998 | 0102 | 11/19/1998 | 2359 |
Subject: | TWP/C2 Installation |
DataStreams: | twpgndradC2.00, twpgndrad20sC2.a1, twpgndrad60sC2.a1, twpgndrad60sC2.b1 |
Description: | The Nauru ARCS was installed during the period September-November 1998. Data were being collected by the end of October, but for the first several weeks of November, the site was undergoing considerable change, so data from that period should be used with caution. The official site dedication occured on November 20. Most on-site activity ended following the dedication so we will consider November 20 to be the beginning of the Nauru operations. The last members of the installation team left Nauru on November 24. |
Measurements: | twpgndradC2.00:
twpgndrad60sC2.b1:
twpgndrad60sC2.a1:
twpgndrad20sC2.a1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
01/03/2000 | 2225 | 01/19/2000 | 2359 |
06/27/2000 | 0440 | 06/30/2000 | 2359 |
Subject: | TWP/GNDRAD/C2 - Calibration Check; GNDRAD instruments inverted |
DataStreams: | twpgndrad20sC2.a1, twpgndrad60sC2.a1, twpgndrad60sC2.b1 |
Description: | During calibration check periods the gndrad instruments are inverted to compare with the skyrad pir and psp. |
Measurements: | twpgndrad60sC2.b1:
twpgndrad60sC2.a1:
twpgndrad20sC2.a1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
08/07/1999 | 0415 | 08/07/1999 | 0600 |
Subject: | Cailbration interruption of data at TWP Nauru |
DataStreams: | twpgndradC2.00, twpgndrad20sC2.a1, twpgndrad60sC2.a1, twpgndrad60sC2.b1 |
Description: | Data interrupted to perform electronic calibration of data logger |
Measurements: | twpgndradC2.00:
twpgndrad60sC2.b1:
twpgndrad60sC2.a1:
twpgndrad20sC2.a1:
|