DQR ID | Subject | Data Streams Affected |
---|---|---|
D110131.1 | SBS/MET/M1 - Atmospheric pressure spikes | sbsmetM1.b1 |
D110131.2 | SBS/MET/M1 - Site setup | sbsmetM1.b1 |
D110513.2 | SBS/MET/M1 - Incorrect atmospheric pressure | sbsmetM1.b1 |
D110926.1 | SBS/GNDRAD/M1 - IRT bias | sbsgndrad60sM1.b1 |
D120203.2 | SBS/GNDRAD/M1 - Upwelling Shortwave data incorrect | sbsgndrad20sM1.a0, sbsgndrad60sM1.b1 |
D120203.4 | SBS/GNDRAD/M1 - Upwelling longwave initial problems | sbsgndrad20sM1.a0, sbsgndrad60sM1.b1 |
D120203.5 | SBS/GNDRAD/M1 - Noise in upwelling LW/SW signals | sbsgndrad20sM1.a0, sbsgndrad60sM1.b1 |
D120204.1 | SBS/SKYRAD/M1 - Noise in downwelling SW hemispheric | sbsskyrad20sM1.a0, sbsskyrad60sM1.b1 |
Start Date | Start Time | End Date | End Time |
---|---|---|---|
11/15/2010 | 0000 | 01/28/2011 | 2000 |
Subject: | SBS/MET/M1 - Atmospheric pressure spikes |
DataStreams: | sbsmetM1.b1 |
Description: | A nearby AC unit was causing +/-.05 (approx.) changes in pressure values, most frequently during the daylight hours but occasionally over night. Corrective action was taken to shield the sensor 1/28. |
Measurements: | sbsmetM1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
09/27/2010 | 0000 | 11/15/2010 | 0000 |
Subject: | SBS/MET/M1 - Site setup |
DataStreams: | sbsmetM1.b1 |
Description: | The instruments were being setup and installed during this period. Some data may be questionable and minimal quality reporting will be done. |
Measurements: | sbsmetM1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
04/07/2011 | 1945 | 04/12/2011 | 1400 |
Subject: | SBS/MET/M1 - Incorrect atmospheric pressure |
DataStreams: | sbsmetM1.b1 |
Description: | The atmospheric pressure readings showed a ~.3 - 1 mb oscillatory behavior. The sensor tube was found to be obstructed. It was fixed and proper function resumed. |
Measurements: | sbsmetM1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
02/20/2011 | 1300 | 04/28/2011 | 1930 |
Subject: | SBS/GNDRAD/M1 - IRT bias |
DataStreams: | sbsgndrad60sM1.b1 |
Description: | The IRT was indicating lower surface temperatures than the PIR. It is unknown how the problem was corrected, but there was a concurrent increase in logger voltage of 0.02 V. |
Measurements: | sbsgndrad60sM1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
09/22/2010 | 1432 | 09/28/2010 | 2208 |
Subject: | SBS/GNDRAD/M1 - Upwelling Shortwave data incorrect |
DataStreams: | sbsgndrad20sM1.a0, sbsgndrad60sM1.b1 |
Description: | Upwelling shortwave signal is flat (0 W/m^2) from 1532 UTC on 2010-09-24 through 1636 UTC on 2010-09-28 when it jumps to 600W/m^2. Value jumps between 800 W/m^2 and -9999 (missing) until 1833 UTC 2010-09-28. Signal is adjusted downward ~250 W/m^2 at 2208 UTC on 2010-09-28. Data during the specified period are incorrect and cannot be corrected. |
Measurements: | sbsgndrad20sM1.a0:
sbsgndrad60sM1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
09/22/2010 | 1432 | 09/28/2010 | 2208 |
Subject: | SBS/GNDRAD/M1 - Upwelling longwave initial problems |
DataStreams: | sbsgndrad20sM1.a0, sbsgndrad60sM1.b1 |
Description: | The Upwelling Longwave signal was not present in the datastreams until 1746 UTC on 9/23/2010. The signal was then very noisy and frequently above empirical limits (575 W/m^2) between 1700 and 2200 UTC until 2208 on 9/28/2010 when it was adjusted upward about 50 W/m^2. |
Measurements: | sbsgndrad20sM1.a0:
sbsgndrad60sM1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
10/23/2010 | 0328 | 10/26/2010 | 1404 |
11/03/2010 | 2037 | 11/04/2010 | 1615 |
Subject: | SBS/GNDRAD/M1 - Noise in upwelling LW/SW signals |
DataStreams: | sbsgndrad20sM1.a0, sbsgndrad60sM1.b1 |
Description: | During these periods the Upwelling Longwave and Upwelling Shortwave signals experience wild swings between large negative and large positive values, sometimes going missing (-9999) for several hours at a time. |
Measurements: | sbsgndrad20sM1.a0:
sbsgndrad60sM1.b1:
|
Start Date | Start Time | End Date | End Time |
---|---|---|---|
10/29/2010 | 1452 | 10/29/2010 | 2016 |
Subject: | SBS/SKYRAD/M1 - Noise in downwelling SW hemispheric |
DataStreams: | sbsskyrad20sM1.a0, sbsskyrad60sM1.b1 |
Description: | Downwelling Shortwave Hemispheric signal varies wildly between missing (-9999) and large positive values over this period. |
Measurements: | sbsskyrad20sM1.a0:
sbsskyrad60sM1.b1:
|