DQRID : D020716.2
Start DateStart TimeEnd DateEnd Time Data Quality Metric
11/15/1995210011/16/19951700Incorrect
more
Subject:
SGP/EBBR/E9 - Annual calibration changeout
DataStreams:sgp5ebbrE9.b1, sgp30ebbrE9.b1, sgp15ebbrE9.b1
Description:
On November 15, 1995 the changeout for annual calibration occurred at E9,
Ashton, KS.  After installation of the new SEBS unit, RH output was zero.  
The next day site operations personnel found that the RH probe cable 
connections were loose.  RH returned to normal after the connections were 
tightened at 1700 GMT on 16 November 1995.  During the period of time that 
the connections were not made, the following data values are incorrect: 

5 minute:  hum_top, hum_bot, vp_top, vp_bot

15 minute: mv_hum_r, mv_hum_l

30 minute: hum_top, hum_bot, vp_top, vp_bot.
Suggestions: 
Measurements:sgp30ebbrE9.b1:
  • rh_top_fraction
  • rh_bottom_fraction
  • vapor_pressure_top
  • vapor_pressure_bottom
more
sgp15ebbrE9.b1:
  • rh_left_mv
  • rh_right_mv
more
sgp5ebbrE9.b1:
  • vapor_pressure_top
  • rh_bottom_fraction
  • vapor_pressure_bottom
  • rh_top_fraction
more