Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
07/14/1997 | 0915 | 08/05/1997 | 2300 | Suspect |
Subject: | E8 EBBR Lightning Strike |
DataStreams: | sgp30ebbrE8.b1, sgp15ebbrE8.b1, sgp5ebbrE8.b1 |
Description: | DQR No: Platform: EBBR Subject: E8 EBBR Lightning Strike Date Submitted: October 16, 1997 Submitted By: _x_ Instrument Mentor ___ EST Member ___ Science Team Member ___ Other Platform/Measurement: EBBR/Numerous What level data: (raw,a0,a1,b1,c1 etc): a1 (15 and 30 minute) a0 (5 minute) What location was the data collected at: E8, Coldwater, KS Period of time in question Begin Date 07/14/97 Time 0915 GMT End Date 08/05/97 Time 2300 GMT Discussion of Problem: A lightning "strike" to the EF 8 Facility shortly after 0900 GMT on 14 July 1997 caused the failure of several EBBR sensors, the solar panel voltage regulator, and the CR10X datalogger. All data is missing for the period above, with degraded operations thereafter for a couple of months while replacement parts slowly became available (a separate DQR will cover the degraded data period). |
Suggestions: | |
Measurements: | sgp5ebbrE8.b1: more
sgp15ebbrE8.b1: more sgp30ebbrE8.b1: more |