DQRID : D120516.8
Start DateStart TimeEnd DateEnd Time Data Quality Metric
08/09/2005000008/09/20050200Incorrect
08/05/2005003008/05/20050200Incorrect
more
Subject:
TWP/QCRAD/C3 - Tower inverted for instrument testing and replacement
DataStreams:twpqcrad1longC3.s1, twpqcrad1longC3.c1, twpqcrad1longC3.s2, twpqcrad1longC3.c2
Description:
The tower at Darwin was brought down to test and replace the GNDRAD PIR on 8/5/2005 and 
the PSP on 8/9/2005.  Upwelling fluxes are incorrect.

Described in instrument DQR D050919.4.
Suggestions: 
Do not use upwelling fluxes during this time.
Measurements:twpqcrad1longC3.s2:
  • up_long_hemisp
  • up_short_hemisp
more
twpqcrad1longC3.c2:
  • up_short_hemisp
  • up_long_hemisp
more
twpqcrad1longC3.s1:
  • up_short_hemisp
  • up_long_hemisp
more
twpqcrad1longC3.c1:
  • up_long_hemisp
  • up_short_hemisp
more

Close this window