Description: | DATA REPROCESSED and CORRECTED:
The calibration had changed as a result of the repairs made by Radiometrics and the RF
deck temperature had been set to 325K for testing. The temperature was decreased to 307K to
prevent thermal instability in winter and the calibration was changed in the
configuration file with the values supplied on the repair report. The calibration coefficients were
derived automatically after the changes were put into affect. The data were reprocessed
using the derived calibration coefficients.
ORIGINAL DQR CATEGORY: Red( Incorrect)
REPROCESSED and CORRECTED DATA ARCHIVED:2016-03-29
REPROCESS IDENTIFICATION NUMBER: RID 209
---------------------------------------------------
--- ORIGINAL DQR DESCRIPTION ---
---------------------------------------------------
When MWR#20 was returned to service on 9/1/2005, the calibration had changed as a result
of the repairs made by Radiometrics and the RF deck temperature had been set to 325K for
testing. On 9/2, the temperature was decreased to 307K to prevent thermal instability in
winter and the calibration was changed in the configuration file with the values supplied
on the repair report.
The data need to be reprocessed with the calibration coefficients that were automatically
derived after these changes were put into affect. They are: tnd_nom23=185.621,
tnd_nom31=158.801, tc23=-0.022, tc31=-0.039. |