DQRID : D130227.1
Start DateStart TimeEnd DateEnd Time Data Quality Metric
09/29/2012200001/23/20131900Incorrect
more
Subject:
PVC/MPL/M1 - Instrument failure after power outage
DataStreams:pvcmplpolfsM1.b1
Description:
MPL was intermittently down for a few days before going completely down for ~17 days.  
When it came back online on 10/22, the background signals were too high. The instrument was 
replaced 20130123.
Suggestions: 
Ignore any data during this time period
Measurements:pvcmplpolfsM1.b1:
  • first_data_bin
  • background_signal_co_pol
  • range_bin_width
  • range_bin_time
  • mcs_mode
  • range
  • pulse_rep
  • overlap_correction_heights
  • background_signal_cross_pol
  • max_altitude
  • overlap_correction
  • num_channels
  • deadtime_correction
  • polarization_control
  • polarization_control_voltage
  • num_bins
  • signal_return_cross_pol
  • signal_return_co_pol
  • background_signal_std_cross_pol
  • dead_time_corrected
  • range_bins
  • preliminary_cbh
  • height
  • deadtime_correction_counts
  • scope_temp
  • background_signal_std_co_pol
  • range_offset
more

Close this window