Start Date | Start Time | End Date | End Time |
---|---|---|---|
05/10/2000 | 0000 | 06/30/2000 | 2359 |
Subject: | SGP/SIRS/C1 - Reprocess: Wire are switched |
DataStreams: | sgpsirsC1.a1 |
Description: | Upwelling longwave and downwelling longwave values are switched. Instrument Engineering logs (OMIS) indicate the following: "T/S indicated that the readings may be caused by the sensor wires being switched around. Switched the wires labeled 5H with the wire labeled 5L on the data logger. The readings on the DIR went from minus readings to positive readings. Will await further instruction from site scientist to perform any other PM". |
Suggestions: | Reprocess the data. |
Measurements: | sgpsirsC1.a1: more
|