DQRID : D020613.10
Start DateStart TimeEnd DateEnd Time
11/05/1998224911/19/19982359
more
Subject:
TWP/C2  Installation
DataStreams:twpsondewnpnC2.00, twpsondewnpnC2.a0, twpsondewnpnC2.a1
Description:
The Nauru ARCS was installed during the period September-November
1998.  Data were being collected by the end of October, but for the
first several weeks of November, the site was undergoing considerable
change, so data from that period should be used with caution.  The
official site dedication occured on November 20.  Most on-site
activity ended following the dedication so we will consider November
20 to be the beginning of the Nauru operations.  The last members of
the installation team left Nauru on November 24.
Suggestions: 
Measurements:twpsondewnpnC2.a0:
  • base time in epoch(base_time)
  • Relative Humidity (hybrid-b grid)(rh)
  • Retrieved pressure profile(pres)
  • lon(lon)
  • North Latitude(lat)
  • Ascent rate(asc)
  • Wind status(wstat)
  • Time offset from base_time(time_offset)
  • -180.0 - +180.0(alt)
  • Wind Speed(wspd)
  • Dewpoint Temperature(dp)
  • Dry Bulb Temperature(tdry)
  • Wind Direction(deg)
more
twpsondewnpnC2.a1:
  • North Latitude(lat)
  • Wind status(wstat)
  • Dewpoint Temperature(dp)
  • Wind Speed(wspd)
  • lon(lon)
  • Time offset from base_time(time_offset)
  • Relative Humidity (hybrid-b grid)(rh)
  • base time in epoch(base_time)
  • V wind component(v_wind)
  • Wind Direction(deg)
  • Easterly Wind Component(u_wind)
  • -180.0 - +180.0(alt)
  • Dry Bulb Temperature(tdry)
  • Retrieved pressure profile(pres)
  • Ascent rate(asc)
more
twpsondewnpnC2.00:
  • (Raw data stream - documentation not supported)
more

Close this window