DQRID : D020613.6
Start DateStart TimeEnd DateEnd Time
11/06/1998060111/19/19982359
more
Subject:
TWP/C2  Installation
DataStreams:twpmplsmask1clothC2.c1, twpmplcmask1clothC2.c1
Description:
The Nauru ARCS was installed during the period September-November
1998.  Data were being collected by the end of October, but for the
first several weeks of November, the site was undergoing considerable
change, so data from that period should be used with caution.  The
official site dedication occured on November 20.  Most on-site
activity ended following the dedication so we will consider November
20 to be the beginning of the Nauru operations.  The last members of
the installation team left Nauru on November 24.
Suggestions: 
Measurements:twpmplsmask1clothC2.c1:
  • MPL Cloth et al. Algorithm Significance Mask(SigniMaskMplCloth)
  • Time offset from base_time(time_offset)
  • Range Heights (center of radar sample volume)(Heights)
  • base time in epoch(base_time)
more
twpmplcmask1clothC2.c1:
  • base time in epoch(base_time)
  • MPL Cloth et al. Algorithm Cloud Mask(CloudMaskMplCloth)
  • Time offset from base_time(time_offset)
  • Range Heights (center of radar sample volume)(Heights)
more

Close this window