DQRID : D020617.2
Start DateStart TimeEnd DateEnd Time
10/06/1999150510/06/19991522
more
Subject:
SGP/SMOS/E6 - E6 SMOS lowered to surface to install counterweights
DataStreams:sgpsmosE6.01, sgp1smosE6.a0, sgp30smosE6.a1, sgp1440smosE6.a0, sgp1smosE6.00
Description:
The E6 SMOS was lowered to the surface on 6 OCT 1999 between 1505 and 1522 GMT 
while counterweights were installed.  All wind speed and direction data are incorrect 
during this period.
Suggestions: 
Wind speed and direction are incorrect during this period.
Measurements:sgpsmosE6.01:
  • (Raw data stream - documentation not supported)
more
sgp30smosE6.a1:
  • Standard Deviation of Wind Speed(sd_wspd)
  • Wind Speed(wspd)
  • Standard Deviation of wind direction(sd_deg)
  • Wind Speed (vector averaged)(wspd_va)
  • Wind Direction(wdir)
more
sgp1smosE6.00:
  • (Raw data stream - documentation not supported)
more
sgp1440smosE6.a0:
  • Minimum of Wind speed(min_wspd)
  • Time of Minimum Wind Speed(time_min_wspd)
  • Maximum of Wind speed(max_wspd)
  • Time of Maximum Wind Speed(time_max_wspd)
more
sgp1smosE6.a0:
  • Standard Deviation of wind direction(sd_deg)
  • Wind Speed (vector averaged)(wspd_va)
  • Wind Speed(wspd)
  • Wind Direction(wdir)
more

Close this window