DQRID : D020619.4
Start DateStart TimeEnd DateEnd Time
10/05/1999132510/05/19991350
more
Subject:
SGP/SMOS/E8 - E8 SMOS lowered to surface to install counterweights
DataStreams:sgp1smosE8.a0, sgp1smosE8.00, sgp1440smosE8.a0, sgpsmosE8.01, sgp30smosE8.a1
Description:
The E8 SMOS was lowered to the surface on 5 OCT 1999 between 1325 and 1350 GMT 
while counterweights were installed.  All wind speed and direction data are incorrect 
during this period.
Suggestions: 
Wind speed and direction are incorrect during this period.
Measurements:sgp1smosE8.a0:
  • Wind Speed (vector averaged)(wspd_va)
  • Wind Direction(wdir)
  • Standard Deviation of wind direction(sd_deg)
  • Wind Speed(wspd)
more
sgpsmosE8.01:
  • (Raw data stream - documentation not supported)
more
sgp1440smosE8.a0:
  • Maximum of Wind speed(max_wspd)
  • Time of Minimum Wind Speed(time_min_wspd)
  • Minimum of Wind speed(min_wspd)
  • Time of Maximum Wind Speed(time_max_wspd)
more
sgp1smosE8.00:
  • (Raw data stream - documentation not supported)
more
sgp30smosE8.a1:
  • Wind Direction(wdir)
  • Standard Deviation of wind direction(sd_deg)
  • Wind Speed (vector averaged)(wspd_va)
  • Wind Speed(wspd)
  • Standard Deviation of Wind Speed(sd_wspd)
more

Close this window