DQRID : D020620.1
Start DateStart TimeEnd DateEnd Time
10/20/1999111010/20/19991126
more
Subject:
SGP/SMOS/E9 - E9 SMOS lowered to surface to install counterweights
DataStreams:sgp1440smosE9.a0, sgp30smosE9.a1, sgp1smosE9.a0, sgp1smosE9.00, sgpsmosE9.01
Description:
The E9 SMOS was lowered to the surface on 20 OCT 1999 between 1110 and 1126 GMT 
while counterweights were installed.  All wind speed and direction data are incorrect 
during this period.
Suggestions: 
Wind speed and direction are incorrect during this period.
Measurements:sgpsmosE9.01:
  • (Raw data stream - documentation not supported)
more
sgp1smosE9.a0:
  • Wind Direction(wdir)
  • Wind Speed (vector averaged)(wspd_va)
  • Wind Speed(wspd)
  • Standard Deviation of wind direction(sd_deg)
more
sgp1440smosE9.a0:
  • Maximum of Wind speed(max_wspd)
  • Time of Maximum Wind Speed(time_max_wspd)
  • Time of Minimum Wind Speed(time_min_wspd)
  • Minimum of Wind speed(min_wspd)
more
sgp30smosE9.a1:
  • Wind Speed (vector averaged)(wspd_va)
  • Wind Speed(wspd)
  • Standard Deviation of Wind Speed(sd_wspd)
  • Wind Direction(wdir)
  • Standard Deviation of wind direction(sd_deg)
more
sgp1smosE9.00:
  • (Raw data stream - documentation not supported)
more

Close this window