Start Date | Start Time | End Date | End Time |
---|---|---|---|
02/14/2002 | 1515 | 02/14/2002 | 1531 |
01/15/2002 | 0645 | 01/15/2002 | 1701 |
Subject: | SGP/EBBR/E2 - Reprocess: Soil Temperature #2 Incorrect |
DataStreams: | sgp30ebbrE2.b1 |
Description: | The indicated measurements were incorrect because soil temperature #2 was incorrect. Average soil heat flow, sensible heat and latent heat can be recalculated using the remaining good sets of soil sensors as follows: ave_shf = (g1 + g3 + g4 + g5)/4 e = -(q + ave_shf)/(1 + bowen) h = -(q + e + ave_shf) |
Suggestions: | |
Measurements: | sgp30ebbrE2.b1: more
|