DQRID : D020724.34
Start DateStart TimeEnd DateEnd Time
06/27/1998235006/28/19982348
more
Subject:
SHB/GNDRAD/C1  - Dust on dome
DataStreams:shbgndrad60sC1.a1
Description:
Dust from the UV-embrittled insulation on the IRT may have collected on the PSP. Exact 
starting time is unknown so time of last confirmed clean dome is used.
Suggestions: 
Measurements:shbgndrad60sC1.a1:
  • PSP1 unshaded minimum(psp1_min)
  • PSP1 mean(psp1_mean)
  • PSP1 unshaded standard deviation(psp1_sd)
  • PSP1 maximum(psp1_max)
more

Close this window