DQRID : D030304.1
Start DateStart TimeEnd DateEnd Time
05/24/2002000006/24/20022359
more
Subject:
NSA/SKYRAD/C1: Noisy PIR data at Barrow
DataStreams:nsaskyrad60sC1.a1, nsaskyrad60sC1.b1
Description:
PIR1 data is noisy throughout the entire period, though there is still a definite signal 
through the noise.
Suggestions: 
null
Measurements:nsaskyrad60sC1.a1:
  • Downwelling longwave hemispheric irradiance, shaded pyrgeometer(down_long_hemisp_shaded)
  • Downwelling longwave hemispheric irradiance, shaded pyrgeometer, standard
    deviation(down_long_hemisp_shaded_std)
  • Downwelling Longwave Hemispheric Irradiance, Shaded Pyrgeometer, Minima(down_long_hemisp_shaded_min)
  • Downwelling Longwave Hemispheric Irradiance, Shaded Pyrgeometer, Maxima(down_long_hemisp_shaded_max)
more
nsaskyrad60sC1.b1:
  • Downwelling Longwave Hemispheric Irradiance, Shaded Pyrgeometer, Minima(down_long_hemisp_shaded_min)
  • Downwelling longwave hemispheric irradiance, shaded pyrgeometer(down_long_hemisp_shaded)
  • Downwelling Longwave Hemispheric Irradiance, Shaded Pyrgeometer, Maxima(down_long_hemisp_shaded_max)
  • Downwelling longwave hemispheric irradiance, shaded pyrgeometer, standard
    deviation(down_long_hemisp_shaded_std)
more

Close this window