DQRID : D050919.4
Start DateStart TimeEnd DateEnd Time
08/05/2005003008/05/20050200
08/09/2005000008/09/20050200
more
Subject:
TWP/GNDRAD/C3 - Tower inverted for instrument testing and replacement
DataStreams:twpgndrad60sC3.b1
Description:
The tower at Darwin was brought down to test and replace the Gndrad PIR on 8/5/2005 and 
the PSP on 8/9/2005
Suggestions: 
Data incorrect for these hours
Measurements:twpgndrad60sC3.b1:
  • Surface infra-red temperature(sfc_ir_temp)
  • Surface Infra-Red Temperature, Minima(sfc_ir_temp_min)
  • Surface Infra-Red Temperature, Standard Deviation(sfc_ir_temp_std)
  • 25 meter Upwelling Shortwave Hemispheric Irradiance, Pyranometer(up_short_hemisp)
  • Surface Infra-Red Temperature, Maxima(sfc_ir_temp_max)
  • Upwelling shortwave hemispheric irradiance, pyranometer, minima(up_short_hemisp_min)
  • Upwelling longwave hemispheric irradiance, pyrgeometer, maxima(up_long_hemisp_max)
  • Upwelling (10 meter) Shortwave Hemispheric Irradiance, Ventilated Pyranometer,
    Standard Deviation(up_short_hemisp_std)
  • Upwelling (10 meter) Longwave Hemispheric Irradiance, Ventilated Pyrgeometer,
    Standard Deviation(up_long_hemisp_std)
  • Upwelling (10 meter) Shortwave Hemispheric Irradiance, Pyranometer, Maxima(up_short_hemisp_max)
  • Upwelling Longwave Hemispheric Irradiance, Pyrgeometer, Minima(up_long_hemisp_min)
  • 10 meter Upwelling Longwave Hemispheric Irradiance, Pyrgeometer(up_long_hemisp)
more