DQRID : D071106.1
Start DateStart TimeEnd DateEnd Time
03/16/2007000011/05/20071344
more
Subject:
FKB/GNDRAD/M1 - Reprocessed: Incorrect calibrations
DataStreams:fkbgndrad60sM1.b1, fkbgndrad20sM1.a0
Description:
An incorrect calibration coefficient was applied to the up_short_hemispheric instrument 
(PSP) for the specified time period.  Changes in the ARM PSP calibration procedure now 
generates two different calibration coefficients for the same instrument, Cf(non "IR 
corrected")and Cfc("IR corrected").  CFc should have been applied to this instrument but CF was 
erroneously used.

The affected PSP is S/N 34292F3 Cf=117.61 (incorrect applied), Cfc(correct)=116.07W/m2/mV

These data were reprocessed and archived in March 2008.
Suggestions: 
Retrieve reprocessed data for your analysis
Measurements:fkbgndrad60sM1.b1:
  • 25 meter Upwelling Shortwave Hemispheric Irradiance, Pyranometer(up_short_hemisp)
  • Upwelling shortwave hemispheric irradiance, pyranometer, minima(up_short_hemisp_min)
  • Upwelling (10 meter) Shortwave Hemispheric Irradiance, Pyranometer, Maxima(up_short_hemisp_max)
  • Upwelling (10 meter) Shortwave Hemispheric Irradiance, Ventilated Pyranometer,
    Standard Deviation(up_short_hemisp_std)
more
fkbgndrad20sM1.a0:
  • Instantaneous Upwelling Shortwave Hemispheric Irradiance, Pyranometer(inst_up_short_hemisp)
more