DQRID : D100128.1
Start DateStart TimeEnd DateEnd Time
05/23/2009160001/27/20101510
more
Subject:
SGP/SIRS/E7 - Upwelling Longwave inconsistent
DataStreams:sgpsirsE7.b1, sgpsirs20sE7.a0
Description:
The upwelling IR PIR instrument (up_long_hemisp) had bad connections during this time 
period.  The case thermistor (Mux set #2) was reading erratic values and corrupting the 
up_long_hemisp data completely. 

The net_ir was valid but cannot be corrected without the case thermistor measurement to 
determine the incoming IR (i.e. up_long_hemisp).
Suggestions: 
Measurements:sgpsirs20sE7.a0:
  • Instantaneous Upwelling Pyrgeometer Dome Thermistor Resistance Pyrgeometer(inst_up_long_dome_resist)
  • Instantaneous Upwelling Pyrgeometer Thermopile Pyrgeometer(inst_up_long_hemisp_tp)
  • Instantaneous Upwelling Pyrgeometer Case Thermistor Resistance, Pyrgeometer(inst_up_long_case_resist)
more
sgpsirsE7.b1:
  • Instantaneous upwelling pyrgeometer case thermistor temperature, pyrgeometer(inst_up_long_case_temp)
  • Instantaneous Dome Temperature(inst_up_long_dome_temp)
  • Instantaneous Upwelling Longwave Hemispheric Irradiance, Pyrgeometer(up_long_netir)
  • 10 meter Upwelling Longwave Hemispheric Irradiance, Pyrgeometer(up_long_hemisp)
  • Upwelling Longwave Hemispheric Irradiance, Pyrgeometer, Minima(up_long_hemisp_min)
  • Upwelling (10 meter) Longwave Hemispheric Irradiance, Ventilated Pyrgeometer,
    Standard Deviation(up_long_hemisp_std)
  • Upwelling longwave hemispheric irradiance, pyrgeometer, maxima(up_long_hemisp_max)
more

Close this window