GAN/SKYRAD/M1 - PIR2 failure
DataStreams:ganskyrad20sM1.a0, ganskyrad60sM1.b1
Description:
Increasing difference between PIR1 and PIR2 beginning December 12.  Suspected problem with 
PIR2 thermistor bridge or instrument thermistor.  OPS replaced PIR2 unit with a spare. 
The data from PIR2 after replacement appears to be normal.
Suggestions: 
Use PIR1 data for the specified period.
Measurements:ganskyrad20sM1.a0:
  • Instantaneous Downwelling Pyrgeometer Case Thermistor Resistance, Pyrgeometer2(inst_down_long_hemisp2_case_resist)
  • Instantaneous Downwelling Pyrgeometer Thermopile, Pyrgeometer2(inst_down_long_hemisp2_tp)
  • Instantaneous Downwelling Pyrgeometer Dome Thermistor Resistance, Pyrgeometer2(inst_down_long_hemisp2_dome_resist)
more
ganskyrad60sM1.b1:
  • Downwelling Longwave Hemispheric Irradiance, Pyrgeometer2(down_long_hemisp2)
  • Instantaneous Downwelling Pyrgeometer Dome Thermistor Temperature, Pyrgeometer2(inst_down_long_hemisp2_dome_temp)
  • Downwelling Longwave Hemispheric Irradiance, Pyrgeometer2, Standard Deviation(down_long_hemisp2_std)
  • Instantaneous Downwelling Pyrgeometer Case Thermistor Temperature, Pyrgeometer2(inst_down_long_hemisp2_case_temp)
  • Instantaneous Downwelling Pyrgeometer Thermopile, Pyrgeometer2(inst_down_long_hemisp2_tp)
  • Downwelling Longwave Hemispheric Irradiance, Pyrgeometer2, Maxima(down_long_hemisp2_max)
  • Downwelling Longwave Hemispheric Irradiance, Pyrgeometer2, Minima(down_long_hemisp2_min)