DQRID : D120516.7
Start DateStart TimeEnd DateEnd Time
01/03/2008100001/07/20080515
more
Subject:
TWP/QCRAD/C3 - GNDRAD shutdown for tropical cyclone
DataStreams:twpqcrad1longC3.s1, twpqcrad1longC3.c1, twpqcrad1longC3.s2, twpqcrad1longC3.c2
Description:
On Jan 3rd approximately 1000GMT the effects of a tropical cyclone started affecting the 
installed radiometer measurements at ARM/TWP/C3(Darwin) - both SKYRAD and GNDRAD.  On Jan 
4th, 0740 GMT the GNDRAD was shutdown to avoid damage due to the close passing of this 
storm. GNDRAD was restarted Jan 7th 0515GMT.
Suggestions: 
null
Measurements:twpqcrad1longC3.s2:
  • 10 meter Upwelling Longwave Hemispheric Irradiance, Pyrgeometer(up_long_hemisp)
  • 25 meter Upwelling Shortwave Hemispheric Irradiance, Pyranometer(up_short_hemisp)
more
twpqcrad1longC3.c2:
  • 25 meter Upwelling Shortwave Hemispheric Irradiance, Pyranometer(up_short_hemisp)
  • 10 meter Upwelling Longwave Hemispheric Irradiance, Pyrgeometer(up_long_hemisp)
more
twpqcrad1longC3.s1:
  • 25 meter Upwelling Shortwave Hemispheric Irradiance, Pyranometer(up_short_hemisp)
  • 10 meter Upwelling Longwave Hemispheric Irradiance, Pyrgeometer(up_long_hemisp)
more
twpqcrad1longC3.c1:
  • 10 meter Upwelling Longwave Hemispheric Irradiance, Pyrgeometer(up_long_hemisp)
  • 25 meter Upwelling Shortwave Hemispheric Irradiance, Pyranometer(up_short_hemisp)
more

Close this window