DQRID : D121018.10
Start DateStart TimeEnd DateEnd Time
06/29/2012224010/18/20121259
more
Subject:
PVC/SKYRAD/M1 - Reprocess: Incorrect IRT Configuration
DataStreams:pvcskyrad60sM1.b1
Description:
The SKYRAD IRT was installed temporarily (waiting for the new enclosure) in
a vertical orientation, without the use of the gold mirror. When irt_comm
was started, the emissivity parameter in the startup file was not changed to 1.000 
compensate for the absence of the mirror, resulting in a positive bias of about 5 K.

These data may be corrected by adjusting the radiance values for the difference in 
emmissivity.
Suggestions: 
Measurements:pvcskyrad60sM1.b1:
  • Sky Infra Red Temperature Maxima(sky_ir_temp_max)
  • Sky Infra-Red Temperature Minima(sky_ir_temp_min)
  • Sky Infra-Red Temperature(sky_ir_temp)
more

Close this window