DQRID : D131105.1
Start DateStart TimeEnd DateEnd Time
05/15/2013141505/16/20131636
more
Subject:
PVC/SASZE/M1 - Spectrometer communications problem
DataStreams:pvcsaszevisM1.a0, pvcsaszenirM1.a0
Description:
Both NIR and VIS spectrometers lost communication.  Most of the data in this time frame 
are missing.  Occasional NIR spectra are obtained but should not be trusted until robust 
communications were restored after May 16 16:36.
Suggestions: 
Use NFOV2 data if available
Measurements:pvcsaszevisM1.a0:
  • Temperature of avantes AD board(avantes_ad_temperature)
  • Step number in measurement sequence(tag)
  • Spectrometer internal clock ticks(spectrometer_clock_ticks)
  • Spectra(spectra)
  • Temperature of avantes optical bench(avantes_bench_temperature)
  • Integration time of individual spectrometer scans(spectrometer_integration_time)
more
pvcsaszenirM1.a0:
  • Step number in measurement sequence(tag)
  • Temperature of avantes AD board(avantes_ad_temperature)
  • Spectra(spectra)
  • Temperature of avantes optical bench(avantes_bench_temperature)
  • Spectrometer internal clock ticks(spectrometer_clock_ticks)
  • Integration time of individual spectrometer scans(spectrometer_integration_time)
more

Close this window