DQRID : D140926.3
Start DateStart TimeEnd DateEnd Time
09/17/2014150009/23/20142007
more
Subject:
ENA/UHSAS/C1 - Computer Failure
DataStreams:enaaosuhsasC1.a1
Description:
The CPC unit for the UHSAS (and other systems) failed.  The UHSAS was down at this time 
and came back up after the CPC unit was fixed.
Suggestions: 
Measurements:enaaosuhsasC1.a1:
  • Auxiliary measurement, not implemented(auxiliary)
  • Unit temperature(unit_temperature)
  • Scatter signal(scattering_voltage)
  • Lower particle size limit for each bin(lower_size_limit)
  • Current(current)
  • Particle size distribution(size_distribution)
  • time_in_seconds_since_volume_start(time)
  • Reference(reference)
  • Main flow rate(flow)
  • Differential_voltage, see instrument manual(differential_voltage)
  • Sample pressure(sample_pressure)
  • North Latitude(lat)
  • Upper particle size limit for each bin(upper_size_limit)
  • Sheath flow(sheath_flow)
  • base time in epoch(base_time)
  • Purge flow(purge_flow)
  • Bin number(bin_num)
  • Sample volume(sampling_volume)
  • -180.0 - +180.0(alt)
  • Time offset from base_time(time_offset)
  • Temperature used for calculation(temperature)
  • lon(lon)
more

Close this window