DQRID : D141017.2
Start DateStart TimeEnd DateEnd Time
10/09/2014004010/11/20142300
more
Subject:
MAO/NEPHELOMETER/S1 - Air drier failure
DataStreams:maoaosnephdryS1.b1
Description:
The Pentras air drier failed. Consequently the air sample, which is dried by a Nafion 
drier, was not dried rising to 70 to 80 % relative humidity. The dry NEPH data is invalid.
Suggestions: 
Do not use data.
Measurements:maoaosnephdryS1.b1:
  • Aerosol total light scattering coefficient, nominal green wavelength at dry or
    reference RH(Bs_G_Dry_Neph3W_1)
  • Aerosol back-hemispheric light scattering coefficient, nominal green wavelength
    at dry or reference RH(Bbs_G_Dry_Neph3W_1)
  • Aerosol back-hemispheric light scattering coefficient, nominal red wavelength at
    dry or reference RH(Bbs_R_Dry_Neph3W_1)
  • Aerosol total light scattering coefficient, nominal blue wavelength at dry or
    reference RH(Bs_B_Dry_Neph3W_1)
  • Aerosol back-hemispheric light scattering coefficient, nominal blue wavelength
    at dry or reference RH(Bbs_B_Dry_Neph3W_1)
  • Aerosol total light scattering coefficient, nominal red wavelength at dry or
    reference RH(Bs_R_Dry_Neph3W_1)
more