Subject: | MAO/CPC/M1 -Internal leak in instrument |
DataStreams: | maoaoscpcM1.a1
|
Description: | The internal leak in the CPC depleted the signal as the flow through instrument was about
30% of the nominal flow needed to operate the instrument. |
Suggestions: | Use data from the S1 facility system. |
Measurements: | maoaoscpcM1.a1: - Orifice pressure(orifice_pressure)
- Cabinet temperature(cabinet_temp)
- OPC laser current(laser_current)
- Aerosol concentration averaged over times to match N_CCN(concentration)
- Nozzle pressure(nozzle_pressure)
- Ambient Temperature(ambient_temp)
- Optics temperature(optics_temp)
- Saturation temperature(saturation_temp)
- Condensation temperature(condensation_temp)
more
|