Subject: | SGP/SMOS/E15 - T/RH probe cable damaged |
DataStreams: | sgp30smosE15.a1, sgp1smosE15.a0
|
Description: | All temperature and vapor pressure data taken at SMOS E15 on 5 MAY 96
between 1105 and 1400 GMT are incorrect. All other data are OK.
Site Operations personel found the T/RH probe cable damaged and
replaced the probe and cable on 7 MAY 96. |
Suggestions: | All sgp1smosE15 and sgp30smosE15 temperature and vapor pressure data taken
during this period should be flagged as incorrect. |
Measurements: | sgp30smosE15.a1: - Standard deviation of vapor pressure(sd_vap_pres)
- Standard Deviation of Air Temperature(sd_temp)
- Environmental Temperature (hybrid-b grid)(temp)
- Vapor Pressure (kiloPascals)(vap_pres)
more
sgp1smosE15.a0: - Vapor Pressure (kiloPascals)(vap_pres)
- Environmental Temperature (hybrid-b grid)(temp)
more
|