DQRID : D970605.1
Start DateStart TimeEnd DateEnd Time
03/03/1997163005/28/19972110
more
Subject:
SGP/TWR/C1 - Reprocess: 25m and 60m T/RH Comm Lines Switched
DataStreams:sgp1twr25mC1.a0, sgp30twr25mC1.a1, sgp30twr60mC1.a1, sgp1twr60mC1.a0
Description:
On 3 March 1997 an activity of unknown nature took place at SGP, causing 
the communication lines to the 25 and 60 meter T/RH to be switched.  The 
data indicates that the switch occurred between 1630 and 1700 GMT.  I 
submitted a work request to site operations to determine if the two levels 
were switched; they found that they were, as I suspected.  It is not clear 
where this occurred, although we do know that it did not happen at the 
tower CR21X dataloggers location.  The communication lines were temporarily 
"switched back" at the logger location on May 28 at 2110 GMT until it can be 
determined where the switch was actually made.
Suggestions: 
Reprocess data.
Measurements:sgp1twr25mC1.a0:
  • Vapor Pressure (kiloPascals)(vap_pres)
  • Environmental Temperature (hybrid-b grid)(temp)
  • Relative Humidity (hybrid-b grid)(rh)
more
sgp1twr60mC1.a0:
  • Environmental Temperature (hybrid-b grid)(temp)
  • Vapor Pressure (kiloPascals)(vap_pres)
  • Relative Humidity (hybrid-b grid)(rh)
more
sgp30twr25mC1.a1:
  • Standard Deviation of Air Temperature(sd_temp)
  • Relative Humidity (hybrid-b grid)(rh)
  • Vapor Pressure (kiloPascals)(vap_pres)
  • Standard deviation of vapor pressure(sd_vap_pres)
  • Standard Deviation of Relative Humidity(sd_rh)
more
sgp30twr60mC1.a1:
  • Standard Deviation of Air Temperature(sd_temp)
  • Relative Humidity (hybrid-b grid)(rh)
  • Standard deviation of vapor pressure(sd_vap_pres)
  • Vapor Pressure (kiloPascals)(vap_pres)
  • Standard Deviation of Relative Humidity(sd_rh)
more

Close this window