DQRID : D991109.16
Start DateStart TimeEnd DateEnd Time
10/13/1999074510/13/19990810
more
Subject:
SGP/SMOS/E25 - E25 SMOS lowered to surface to install counterweights
DataStreams:sgpsmosE25.01, sgp1smosE25.00, sgp30smosE25.a1, sgp1smosE25.a0
Description:
The E25 SMOS was lowered to the surface on 13 OCT 1999 between 0745 and 0810 GMT 
while counterweights were installed.  All temperature and humidity data are questionable
during this period.
Suggestions: 
Temperature and humidity are questionable during this period.
Measurements:sgp30smosE25.a1:
  • Environmental Temperature (hybrid-b grid)(temp)
  • Standard Deviation of Relative Humidity(sd_rh)
  • Vapor Pressure (kiloPascals)(vap_pres)
  • Standard deviation of vapor pressure(sd_vap_pres)
  • Relative Humidity (hybrid-b grid)(rh)
  • Standard Deviation of Air Temperature(sd_temp)
more
sgp1smosE25.00:
  • (Raw data stream - documentation not supported)
more
sgp1smosE25.a0:
  • Relative Humidity (hybrid-b grid)(rh)
  • Vapor Pressure (kiloPascals)(vap_pres)
  • Environmental Temperature (hybrid-b grid)(temp)
more
sgpsmosE25.01:
  • (Raw data stream - documentation not supported)
more

Close this window